Primary Production Data Analysis

PRIME is a set of Production Performance Indicators in PolyPrime software based on primary production history data (such as flow rates, formation and bottom-hole pressure, pressure tests, production logs) with zoom on wells and field areas which are dragging behind the expected recovery or pressure support targets due to integrity issues, poor connectivity or inaccurate understanding of the reservoir around these wells. This is a primary tool to select the candidates for additional data acquisition.

APPLICATION

1. Assess current production performance:

  • current distribution of recovery against expectations
  • current status and trends of recovery against expectations
  • current status and trends of reservoir depletion against expectations
  • current status and trends of water flood efficiency against expectations

2. Identify and prioritize surveillance opportunities

3. Identify and prioritize redevelopment opportunities

Sample Case 1 – Waterflood Sector Analysis
1. Production History Map
Production History Map
2. Recovery Map
Recovery Map
3. Cross-section & PLT, permeability, GOC, OWC
Cross-section & PLT, permeability, GOC, OWC
4. Cross-section & PLT, STOIIP, GOC, OWC
Cross-section & PLT, STOIIP, GOC, OWC
5. Production History Graphs
Production History Graphs
6. Production Forecasts
Production Forecasts
7. Recovery History
Recovery History
8. Recovery Forecasts
Recovery Forecasts
9. WOR Diagnostic
WOR Diagnostic
10. GOR Diagnostic
GOR Diagnostic
11. Specific Productivity Index Diagnostic
Specific Productivity Index Diagnostic
12. Specific Injectivity Index Diagnostic
Specific Injectivity Index Diagnostic
13. Injection Efficiency Diagnostic
Injection Efficiency Diagnostic